{"id":55508,"date":"2023-07-29T11:47:30","date_gmt":"2023-07-29T11:47:30","guid":{"rendered":"https:\/\/neutrale.al\/?p=55508"},"modified":"2023-07-29T11:47:30","modified_gmt":"2023-07-29T11:47:30","slug":"durres-yacht-marina-perze-kompanine-gjermane-nga-porti-i-durresit-ems-zaptimi-per-dhenien-e-90-te-terminalit-ne-kundershtim-me-kontraten-koncesionare","status":"publish","type":"post","link":"https:\/\/neutrale.al\/index.php\/2023\/07\/29\/durres-yacht-marina-perze-kompanine-gjermane-nga-porti-i-durresit-ems-zaptimi-per-dhenien-e-90-te-terminalit-ne-kundershtim-me-kontraten-koncesionare\/","title":{"rendered":"Durr\u00ebs Yacht Marina \u201cp\u00ebrz\u00eb\u201d kompanin\u00eb gjermane nga Porti  i Durr\u00ebsit; EMS: Zaptimi p\u00ebr dh\u00ebnien e 90% t\u00eb terminalit, n\u00eb kund\u00ebrshtim me kontrat\u00ebn koncesionare\/"},"content":{"rendered":"<p>Projekti i \u201cDurr\u00ebs Yacht &#038; Marina\u201d q\u00eb p\u00ebrkon me zhvillimin e nj\u00eb porti jahtesh, ngritjen e 13 mij\u00eb apartamenteve dhe hoteleve q\u00eb do t\u00eb zhvillohet n\u00eb truallin e portit aktual t\u00eb Durr\u00ebsit po \u00e7on drejt pezullimit t\u00eb aktiviteteve ekonomike t\u00eb shum\u00eb operator\u00ebve q\u00eb p\u00ebrpunojn\u00eb mallrat n\u00eb k\u00ebt\u00eb port, por edhe t\u00eb qindra qytetar\u00ebve durrsake t\u00eb pun\u00ebsuar n\u00eb k\u00ebt\u00eb port.<\/p>\n<p>Prej or\u00ebve t\u00eb para t\u00eb m\u00ebngjesit t\u00eb dit\u00ebs s\u00eb sotme n\u00eb m\u00ebnyr\u00eb t\u00eb befasishme, pa asnj\u00eb\u00a0 komunikim zyrtar \u00ebsht\u00eb bllokuar hyrja p\u00ebr kompanin\u00eb koncensionare gjermane EMS APO q\u00eb p\u00ebrpunon anijet e mallrave rifuxho n\u00eb terminalin Lindor t\u00eb Portit t\u00eb Durr\u00ebsit.<\/p>\n<p>Shkak i nd\u00ebrhyrjes \u00ebsht\u00eb p\u00ebr t\u2019i hapur rrug\u00eb zhvillimit t\u00eb projektit t\u00eb Durr\u00ebs Yahts Marina, ku p\u00ebr faz\u00ebn e par\u00eb t\u00eb nd\u00ebrtimit t\u00eb godinave me apartamente, sipas drejtueseve t\u00eb kompanis\u00eb koncesionare EMS APO do t\u00eb shfryt\u00ebzohet 90% e hap\u00ebsir\u00ebs s\u00eb terminalit lindor ku operon kompania gjermane.<\/p>\n<p>Menaxheri tregtar i koncensionarit Florian Cimo tha p\u00ebr Monitor se bllokimi i hyrjes p\u00ebr n\u00eb terminalin Lindor ku operon kompania koncensionare gjermane \u00ebsht\u00eb kryer pa asnj\u00eb komunikim t\u00eb m\u00ebparsh\u00ebm zyrtar.<\/p>\n<p>\u201cEms Albanian Port Operator Shpk ushtron aktivitetin e saj n\u00eb baz\u00eb t\u00eb Kontrat\u00ebs Kon\u00e7esionare t\u00eb lidhur midis Ems Shipping &#038; Trading GmbH me seli n\u00eb gjermani dhe Ministris\u00eb s\u00eb Pun\u00ebve Publike dhe Transportit (sot Ministria e Infrastruktur\u00ebs dhe e Energjis\u00eb e drejtuar nga Balluku) m\u00eb dat\u00eb 6.5.2013 p\u00ebr Menaxhimin dhe Operimin e Terminalit Lindor t\u00eb Portit t\u00eb Durr\u00ebsit me nj\u00eb afat vlefshm\u00ebrie prej 35 vitesh. (Shiko hart\u00ebn e zon\u00ebs s\u00eb koncesionit dhe tabel\u00ebn e aseteve fizike t\u00eb marra n\u00eb dor\u00ebzim).<\/p>\n<p>Sot, m\u00eb dat\u00eb 29.7.2023, n\u00eb ora 07:00 u konstatua hyrja pa autorizim nga operatori koncesionare t\u00eb forc\u00ebs s\u00eb siguris\u00eb portuale, e drejtuar nga Drejtori Ekzekutiv i saj Pirro Vengu dhe subjekti privat \u201cElmazaj Shpk\u201d duke zaptuar nj\u00eb pjes\u00eb t\u00eb terminalit e cila ndodhet n\u00eb zon\u00ebn koncesionare dhe p\u00ebr t\u00eb cil\u00ebn nuk ka nj\u00eb marr\u00ebveshje p\u00ebr k\u00ebt\u00eb q\u00ebllim.<\/p>\n<p>Subjekti EMS-APO ka depozituar denoncime si n\u00eb SPAK p\u00ebr drejtorin e Autoritetit Portual p\u00ebr veprime t\u00eb nj\u00ebjta t\u00eb ndodhura edhe m\u00eb par\u00eb, por edhe n\u00eb Policin\u00eb e Shtetit. Nga nd\u00ebrhyrja dhe vendosja e barrierave prej betoni, \u00ebsht\u00eb penguar aksesi n\u00eb zyrat e administrat\u00ebs dhe aktiviteti i peshimit t\u00eb kamion\u00ebve i cili \u00ebsht\u00eb nj\u00eb hallk\u00eb e zinxhirit t\u00eb sh\u00ebrbimeve q\u00eb ofrohen nga operatori koncesionare EMS-APO.\u00a0Subjekti po kryen nd\u00ebrhyrje me mjete teknologjike duke vendosur kufizime prej betoni n\u00eb zon\u00ebn e koncesionit (shiko hart\u00ebn dhe list\u00ebn e aseteve t\u00eb marra n\u00eb dor\u00ebzim nga koncesionari)\u201d, pohoi ai.<\/p>\n<p>Edhe m\u00eb her\u00ebt n\u00eb nj\u00eb intervist\u00eb p\u00ebr Monitor, Ceo i kompanis\u00eb koncesionari EMS EPO Manfred Mueller tha se qeveria shqiptare njoftoi transformimin e Portit t\u00eb Durr\u00ebsit n\u00eb nj\u00eb port arg\u00ebtimi pa u dh\u00ebn\u00eb informacion t\u00eb sakt\u00eb dhe nj\u00eb grafik t\u00eb qart\u00eb p\u00ebr nd\u00ebrtimin e portit t\u00eb ri publik n\u00eb Porto Romano, si nj\u00eb vend alternativ p\u00ebr aktivitetin e Fehn-Group\/EMS APO. Mueller pohoi se marr\u00ebveshja p\u00ebr \u201cDurr\u00ebs Yachts Marina\u201d bie n\u00eb kund\u00ebrshtim pasi ka mbivendosje me kontrat\u00ebn koncesionare t\u00eb EMS-Fehn-Group.\u00a0https:\/\/www.monitor.al\/mueller-i-ems-shteti-shkeli-kontraten-dyshime-se-projekti-shteteror-ne-porto-romano-do-behet-ndonjehere\/<\/p>\n<p>Drejtuesit e kompanis\u00eb shtuan se institucionet shqiptare kan\u00eb penguar q\u00ebllimisht aktivitetin e tyre q\u00eb n\u00eb vitin 2020, kur nis\u00ebn trajtimin preferencial p\u00ebr operatorin privat n\u00eb Porto Romano, p\u00ebr t\u00eb vijuar m\u00eb pas z\u00ebnien e hap\u00ebsir\u00ebs s\u00eb portit t\u00eb Durr\u00ebsit p\u00ebr projektin e Marin\u00ebs.\u00a0https:\/\/www.monitor.al\/fatura-40-milione-euro-per-arbitrazhin-ne-portin-e-durresit-kompania-u-demtuam-qellimisht\/<\/p>\n<p>Kompania gjermane EMS APO q\u00eb p\u00ebrpunon anijet e mallrave rifuxho n\u00eb Durr\u00ebs m\u00eb her\u00ebt\u00a0 ka depozituar \u00e7\u00ebshtjen n\u00eb Arbitrazh ku ka k\u00ebrkuar d\u00ebmshp\u00ebrblim prej 40 mln euro p\u00ebr trajtim t\u00eb pabarabart\u00eb dhe diskriminues t\u00eb kontrat\u00ebs koncesionare.<\/p>\n<p>Objekti i kontrat\u00ebs koncesionare \u00ebsht\u00eb menaxhimi, operimi dhe mir\u00ebmbajtja e Terminalit Lindor n\u00eb Portin e Durr\u00ebsit. Shteti shqiptar dhe EMS-Fehn-Group (d.m.th. EMS Shipping &#038; Trading GmbH) kan\u00eb lidhur kontrat\u00ebn koncesionare n\u00eb maj t\u00eb vitit 2013. Kontrata shtrihet p\u00ebr nj\u00eb periudh\u00eb 35-vje\u00e7are nga viti 2013 deri n\u00eb vitin 2048. EMS-Fehn-Group themeloi Operatorin Portual Shqiptar EMS Shpk. (EMS APO) si nj\u00ebsi operacionale n\u00eb Durr\u00ebs. Kontrata i jep EMS-Fehn-Group\/EMS APO t\u00eb drejt\u00ebn p\u00ebr t\u00eb p\u00ebrpunuar ngarkesat rifuxho, ngarkesat e p\u00ebrgjithshme dhe ngarkesat projektesh n\u00eb Terminalin Lindor. \/D.Azo<\/p>\n<p>Zona e koncesionit me hart\u00eb t\u00eb marr\u00eb n\u00eb dorezim me kontrat\u00eb:\u00a0kont konc dhe prot i dorezimit<br \/>\n<a href=\"https:\/\/www.monitor.al\/durres-yacht-marina-perze-kompanine-gjermane-nga-porti-i-durresit-ems-zaptimi-per-dhenien-e-90-te-terminalit-ne-kundershtim-me-kontraten-koncesionare\/?fbclid=IwAR3lqQhkbGrtg7a2h6hAW3GJKrjGIfzRLfKrZ6G6gePL764atbOosjU5KSQ\">Monitor.al<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Projekti i \u201cDurr\u00ebs Yacht &#038; Marina\u201d q\u00eb p\u00ebrkon me zhvillimin e nj\u00eb porti jahtesh, ngritjen e 13 mij\u00eb apartamenteve dhe hoteleve q\u00eb do t\u00eb zhvillohet n\u00eb truallin e portit aktual t\u00eb Durr\u00ebsit po \u00e7on drejt pezullimit t\u00eb aktiviteteve ekonomike t\u00eb shum\u00eb operator\u00ebve q\u00eb p\u00ebrpunojn\u00eb mallrat n\u00eb k\u00ebt\u00eb port, por edhe t\u00eb qindra qytetar\u00ebve durrsake t\u00eb [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":55509,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[118],"tags":[],"class_list":{"0":"post-55508","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-kryesore"},"_links":{"self":[{"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/posts\/55508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/comments?post=55508"}],"version-history":[{"count":2,"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/posts\/55508\/revisions"}],"predecessor-version":[{"id":55511,"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/posts\/55508\/revisions\/55511"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/media\/55509"}],"wp:attachment":[{"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/media?parent=55508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/categories?post=55508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/neutrale.al\/index.php\/wp-json\/wp\/v2\/tags?post=55508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}